Skip to content
← Explore our work

A Roberson project

Floor Leveling, Foundation Piers & Large-Format Tile

This kitchen floor had dropped about 3/4 inch in the corner by the pantry. Two problems were behind it: settling in the foundation, and floor joists carrying too much load over too long a span, because the HVAC air handler was hung from the framing under the house.

We poured three new concrete piers and jacked the floor back up to level, then built a dedicated platform for the air handler so its weight no longer rests on the floor joists. With the structure corrected, the old flooring came up to the plywood subfloor and the kitchen and breakfast area were retiled in large-format gray porcelain with a natural stone look. A low-profile metal transition strip finishes the edge where the new tile meets the existing hardwood.

Outside, we also solved the water that had been pooling along the front of the house. An extensive French drain now runs from the front of the house into the backyard and feeds a basin, where an effluent pump moves the water away from the low area.

Roberson Remodeling & Construction handles structural repairs, drainage and interior renovations for homeowners in Irmo, Columbia and surrounding South Carolina communities.

Project type
Structural Repair, Drainage & Tile Flooring
Start your project
Request a project estimate